search search earth earth CN
Partnership Inquiries
Heavy-Duty Truck Charging "Reverse Breakthrough": East's Industrially Validated Solutions from -30°C Mines to Highways
July 17, 2026
As electric heavy-duty trucks gain momentum, slow charging (282kWh battery takes 90 min from 20%-80%) and poor adaptability of consumer-grade equipment to mining dust and extreme cold remain critical pain points.


 
East adopts a "scenario-first" approach, redesigning hardware to industrial heavy-load standards and establishing a closed-loop process of "research – development – field testing – data iteration" to ensure long-term reliability.

Key Deployments:

  • Zijin Mining, Xinjiang (-30°C, 3,700m altitude): 18 x 320kW chargers, stable across two winters;

  • Baise Expressway, Guangxi: Megawatt station + liquid-cooled ultra-fast charging, enabling highway network coverage;

  • Guangzhou Fenghuanggang Station: 3 x 600kW units, covering all commercial vehicle scenarios;

  • Sinopec Chongzuo Station: Commissioned in 15 days, renovation time cut by 70%.

Core Liquid Cooling Technology:

  • Cooling efficiency up 30%+, single-cabinet output of 1.072MW / 2400A;

  • Module design life >10 years, failure rate <0.1%, priced on par with air cooling;

  • Supports 4-cabinet parallel connection up to 4.2MW.

East delivers integrated zero-carbon charging solutions for mining, logistics, and energy enterprises through proven real-world deployments.

related articles